Home / Factory

You're buying from the people who build it

No trading company in the middle, no showroom rent folded into your quote. Our own facility handles cutting, banding, finishing and packing — which is why we can hold both the price and the quality.

Factory tour

Walk the floor

A short walkthrough of the production line: panel storage, CNC cutting, edge banding, assembly, finishing and packing.

Filmed on our own line · Jiangxi, China 0:53 · Panel store → CNC → edge banding → assembly → finishing → packing

Player not starting on your device? Download the file (8.3 MB), or watch it on YouTube.

Capability

What happens to your order

Five stages, all under one roof. Knowing where your panels are is the difference between a four-week job and a four-month one.

01 · Panel cutting

CNC cutting from the approved drawing file. Every panel is labelled with its unit number and position, so nothing gets mixed between rooms or between units in a multi-unit order.

02 · Edge banding

ABS edging applied to all four sides of every visible panel, with sealed cut edges on wet-zone carcasses. This is where cheap furniture fails first — the tape lifts and moisture gets in.

03 · Assembly & hardware

Units pre-assembled for a test fit, hardware positions drilled and checked, hinge and runner adjustment verified before anything is packed.

04 · Finishing

Water-based lacquers, veneer and laminate pressed in-house. Doors and panels from the same order are finished in the same batch so the tone matches across the whole room.

05 · Packing & crating

Export-grade crating with foam corner protection and moisture barrier. Panels are numbered to the installation drawing, and multi-room orders are packed room by room so the fitter opens one crate at a time.

Quality control

30 checkpoints before it leaves

A panel can look perfect and still be wrong: a millimetre off on a diagonal, a hinge bored on the wrong face, a finish that yellows under daylight. The checklist exists to catch those before the crate is sealed, not after it lands on another continent.

  • Dimensional check against the approved drawing
  • Edge banding adhesion and corner finish
  • Hinge, runner and lift-up function test
  • Colour match across doors from the same batch
  • Hardware count against the packing list
  • Photo record of the packed order before sealing
30 checkpoints

Dimensional accuracy · edge adhesion · hinge and runner function · colour match across doors · hardware count · photo record of the packed order.

Shipping

Getting a kitchen across an ocean without wrecking it

Freight is where most cross-border furniture orders go wrong. Ours is planned before production, not after.

Sea or air

Sea freight for full orders — cheaper per cubic metre, six to eight weeks door to door depending on route. Air freight for sample panels, replacement parts or tight deadlines.

Consolidated crating

Multi-room and multi-unit orders are consolidated into shared crates to reduce the freight cost per unit and the number of boxes you have to account for on site.

Insured and tracked

Every shipment is insured and tracked door to door. If something arrives damaged, photos within 7 days start a replacement, not an argument.

Duties and taxes

Import duties and local taxes are the buyer's responsibility and are declared accurately on every shipment. Ask us before ordering and we'll tell you what your country typically charges, so there are no surprises at the port.

Compliance

Documents for your market

Board grades, formaldehyde limits and labelling requirements differ by country. Tell us where the order is going and we'll confirm which certificates apply and supply the paperwork with the shipment.

Low-formaldehyde boardsSpecified for interiors where children and pets live.
Water-based finishesLow-odour coatings, no solvent smell lingering for weeks.
Documentation on requestBoard and finish certificates supplied per destination market.
Sample panelsPhysical finish samples shipped before you commit to an order.
Questions about production?

Ask us anything before you order

Board grades, freight routes, lead times, installation — send the question and a real person answers, usually within one business day.

Ask a Question